Came out a very different colour to the chart or its maybe just my eyes but sometimes it looks very yellow and other times looks pale cream.If it doesnt grow on me I'll have a job booked for next winter already .
After the 6oz glass and 4 coats of epoxy then 3 coats of marine enamel then 2 coats of red to the bottom up to the first plank , I think I am done there.
And then the 3 coats of epoxy then 2 coats of undercoat and 2 coats of enamel house paint to the sides has hidden most imperfections.The Red , side undercoats and top coats all received 15% of Penetrol.Made the undercoats much denser and gave the top coats a much higher gloss.
Turn over Monday
DPP_2.JPG
Water line is by way of 5mtr length 10mm clear plastic tube filled with water.One end taped to a stick 1200mm off floor.Measurement taken from the transom approximate water line shown on plan after hull leveled port to starboard and fore and aft.Then move other end along hull and mark to hull when water level rests at 1200mm point on stick.(older type of semi transparent garden hose just as good).
You do not have the required permissions to view the files attached to this post.